CSCS Mock Test for Supervisors

This CSCS mock test for supervisors features 55 random questions and answers to help you practice and pass your CSCS supervisor test in 2019. As you would expect, the supervisor test will not be as easy as the operatives test because of the added responsibilities attached to the supervisory role.

Most of the questions in this CSCS supervisor mock test are fairly straightforward, be aware that quite a few questions will require multiple answers and the only way to get a point for that question is by selecting ALL the correct answers. TIP: if a question seems tricky try using the elimination method to get rid of the obvious incorrect answers.

Don’t forget to like, share, or comment if you found this CSCS mock test for supervisors useful. Good Luck!!!

1. The maximum vertical height a fixed ladder can be climbed before requiring an intermediate landing place is ___.

Question 1 of 55

2. According to the Construction (Design and Management) Regulations 2015, which of these MUST a worker have before they can start working on-site? (Choose 2 answers)

Question 2 of 55

3. If a worker tells you they have work-related hand-arm vibration syndrome (HAVS) it should be reported to______.

Question 3 of 55

4. When is it necessary to fit guard-rails to a working platform?

Question 4 of 55

5. According to the Work at Height Regulations, the minimum width of a working platform must be____.

Question 5 of 55

6. According to the Construction (Design and Management) Regulations 2015, which of these MUST be provided before construction work can start, and also maintained until the work finishes?

Question 6 of 55

7. What precaution needs to be taken to ensure that a dumper that is tipping materials into an excavation does not fall in?

Question 7 of 55

8. If you’re using an airbag with a control leak rate feature as a fall arrest, you must ensure the inflation pump ___.

Question 8 of 55

9. What is the purpose of edge protection?

Question 9 of 55

10. You need to use inflatable airbags to protect a small area, why is it dangerous to use airbags that are larger than the area that needs to be protected?

Question 10 of 55

11. What is the main advantage of using a safety net instead of a harness and fall-arrest lanyard?

Question 11 of 55

12. What is the first thing to consider when work needs to be done inside a confined space?

Question 12 of 55

13. According to the Construction (Design and Management) Regulations 2015, what MUST a worker have if a contractor puts that worker on a construction site?

Question 13 of 55

14. When MUST the Health and Safety Executive (HSE) be informed of fatal accidents or dangerous occurrences on-site?

Question 14 of 55

15. How many people must be employed before it becomes necessary to record the significant findings of risk assessments?

Question 15 of 55

16. Where should a sign specifying the number of people allowed on a passenger hoist be displayed?

Question 16 of 55

17. Why is it dangerous to leave someone in a harness for too long after they have fallen?

Question 17 of 55

18. Which of these is a fall arrest system?

Question 18 of 55

19. What are the two main things you'll need when carrying out a COSHH assessment for a substance that is being handled for the first time?

Question 19 of 55

20. What is the largest size permitted for an unprotected gap between any guard-rail, toe-board, barrier or other similar means of protection on a scaffold?

Question 20 of 55

21. What item should be regarded as a last resort for a worker’s safety if he/she is working at height?

Question 21 of 55

22. According to the Construction (Design and Management) Regulations 2015, Which of these MUST be in place before construction work can begin?

Question 22 of 55

23. How should cylinders that contain liquefied petroleum gas (LPG) be stored?

Question 23 of 55

24. A permit to work system is used to ___.

Question 24 of 55

25. Precautions should be taken to avoid plant, materials and people from falling into an excavation ___.

Question 25 of 55

26. According to the Construction (Design and Management) Regulations 2015, where will you find arrangements for managing health and safety on a project?

Question 26 of 55

27. What should you do if you notice workers above a safety net are dropping off-cut materials and debris into the net?

Question 27 of 55

28. If a prohibition notice is issued by a Health and Safety Executive (HSE) inspector it means that______.

Question 28 of 55

29. Where can you obtain details regarding the welfare facilities that must be present on a construction site?

Question 29 of 55

30. Where is the ideal place to rig a safety net?

Question 30 of 55

31. Which piece of equipment is used in conjunction with a cable avoidance tool (CAT) to detect cables?

Question 31 of 55

32. A COSHH assessment tells you how to_____.

Question 32 of 55

33. Where should cylinders that contain liquefied petroleum gas (LPG) be stored when they are supplying appliances in a site cabin?

Question 33 of 55

34. What should be used to protect people passing by from arc eye if electric welding is about to begin?

Question 34 of 55

35. According to the Construction (Design and Management) Regulations 2015, Which of the following MUST be in place before demolition work can begin?

Question 35 of 55

36. Which source of information would be the least reliable when assessing the vibration levels of a powered hand tool?

Question 36 of 55

37. What should a supervisor do if a scaffold is not complete?

Question 37 of 55

38. What is the first thing you should consider when choosing access and egress points on a work-site?

Question 38 of 55

39. Which two factors should be considered when adding first-aid facilities to a site? (Choose 2 answers)

Question 39 of 55

40. According to the Work at Height Regulations, a competent person must inspect a working platform___.

Question 40 of 55

41. A written Health and Safety policy is needed when an employer has ____.

Question 41 of 55

42. Where should an emergency escape route lead?

Question 42 of 55

43. According to the Construction (Design and Management) Regulations 2015, how long MUST you keep inspection records?

Question 43 of 55

44. Which significant hazard do workers face when excavating next to a building or structure?

Question 44 of 55

45. What is the best way for a supervisor or manager to ensure that a method statement has been fully understood by workers?

Question 45 of 55

46. What is the first thing you should consider when putting people to work above public areas?

Question 46 of 55

47. Which three details must be included in a method statement for working at height? (Choose 3 answers)

Question 47 of 55

48. The minimum height of the main guard-rail on a scaffold should be ____.

Question 48 of 55

49. According to the Work at Height Regulations, a scaffold inspection report must be given ____ following an inspection.

Question 49 of 55

50. To check if a RCD connected to a power tool is working correctly you should:

Question 50 of 55

51. What is the purpose of the health and safety file that is given to a client once a project is completed?

Question 51 of 55

52. Why should you use a RCD with 230 volt tools?

Question 52 of 55

53. What danger is created when too much oxygen is in a confined space?

Question 53 of 55

54. What does the Beaufort Scale measure?

Question 54 of 55

55. How should access be handled when workers are working in a riser shaft?

Question 55 of 55


 

Category: CSCS Mock Test, Interactive CSCS Mock Tests

Comments (3)

  1. A J Campbell says:

    Superb Revision Tools

  2. Alex says:

    Excellent stuff. I passed my supervisor test today, great website for practicing.

  3. Seamus says:

    Passed my test today thanks to this website. Keep up the good work.

Leave a Reply

Your email address will not be published. Required fields are marked *