CSCS Mock Test for Supervisors 2024

This CSCS mock test for supervisors features 55 random questions and answers to help you practice and pass your CSCS supervisor test in 2024. As you would expect, the supervisor test will not be as easy as the operatives test because of the added responsibilities attached to the supervisory role.

Most of the questions in this CSCS supervisor mock test are fairly straightforward, be aware that quite a few questions will require multiple answers and the only way to get a point for that question is by selecting ALL the correct answers.

TIP: if a question seems tricky try using the elimination method to get rid of the obviously incorrect answers.

Don’t forget to like, share, or comment if you found this CSCS mock test for supervisors useful. The pass mark for this test is 50 out of 55. Good Luck!!!

1. According to the Work at Height Regulations, a competent person must inspect a working platform___.

Question 1 of 55

2. Which significant hazard do workers face when excavating next to a building or structure?

Question 2 of 55

3. Why should you use a RCD with 230 volt tools?

Question 3 of 55

4. What does the Beaufort Scale measure?

Question 4 of 55

5. According to the Work at Height Regulations, a scaffold inspection report must be given ____ following an inspection.

Question 5 of 55

6. What is the main advantage of using a safety net instead of a harness and fall-arrest lanyard?

Question 6 of 55

7. Which of these is a fall arrest system?

Question 7 of 55

8. A permit to work system is used to ___.

Question 8 of 55

9. Where should a sign specifying the number of people allowed on a passenger hoist be displayed?

Question 9 of 55

10. What is the best way for a supervisor or manager to ensure that a method statement has been fully understood by workers?

Question 10 of 55

11. You need to use inflatable airbags to protect a small area, why is it dangerous to use airbags that are larger than the area that needs to be protected?

Question 11 of 55

12. Precautions should be taken to avoid plant, materials and people from falling into an excavation ___.

Question 12 of 55

13. Which TWO factors should be considered when adding first-aid facilities to a site? (Choose 2 answers)

Question 13 of 55

14. What should a supervisor do if a scaffold is not complete?

Question 14 of 55

15. According to the Construction (Design and Management) Regulations 2015, which of these MUST be provided before construction work can start, and also maintained until the work finishes?

Question 15 of 55

16. To check if a RCD connected to a power tool is working correctly you should:

Question 16 of 55

17. What is the first thing to consider when work needs to be done inside a confined space?

Question 17 of 55

18. What is the purpose of edge protection?

Question 18 of 55

19. What should you do if you notice workers above a safety net are dropping off-cut materials and debris into the net?

Question 19 of 55

20. How should access be handled when workers are working in a riser shaft?

Question 20 of 55

21. According to the Work at Height Regulations, the minimum width of a working platform must be____.

Question 21 of 55

22. The maximum vertical height a fixed ladder can be climbed before requiring an intermediate landing place is ___.

Question 22 of 55

23. What are the TWO main things you'll need when carrying out a COSHH assessment for a substance that is being handled for the first time? (Choose 2 answers)

Question 23 of 55

24. What THREE details must be included in a method statement for working at height? (Choose 3 answers)

Question 24 of 55

25. The minimum height of the main guard-rail on a scaffold should be ____.

Question 25 of 55

26. What is the first thing you should consider when choosing access and egress points on a work-site?

Question 26 of 55

27. Which source of information would be the least reliable when assessing the vibration levels of a powered hand tool?

Question 27 of 55

28. Why is it dangerous to leave someone in a harness for too long after they have fallen?

Question 28 of 55

29. According to the Construction (Design and Management) Regulations 2015, which of these MUST a worker have before they can start working on-site? (Choose 2 answers)

Question 29 of 55

30. What is the largest size permitted for an unprotected gap between any guard-rail, toe-board, barrier or other similar means of protection on a scaffold?

Question 30 of 55

31. If you’re using an airbag with a control leak rate feature as a fall arrest, you must ensure the inflation pump ___.

Question 31 of 55

32. A written Health and Safety policy is needed when an employer has ____.

Question 32 of 55

33. What precaution needs to be taken to ensure that a dumper that is tipping materials into an excavation does not fall in?

Question 33 of 55

34. According to the Construction (Design and Management) Regulations 2015, where will you find arrangements for managing health and safety on a project?

Question 34 of 55

35. How many people must be employed before it becomes necessary to record the significant findings of risk assessments?

Question 35 of 55

36. A COSHH assessment tells you how to_____.

Question 36 of 55

37. When is it necessary to fit guard-rails to a working platform?

Question 37 of 55

38. Where should an emergency escape route lead?

Question 38 of 55

39. Where is the ideal place to rig a safety net?

Question 39 of 55

40. Which piece of equipment is used in conjunction with a cable avoidance tool (CAT) to detect cables?

Question 40 of 55

41. According to the Construction (Design and Management) Regulations 2015, what MUST a worker have if a contractor puts that worker on a construction site?

Question 41 of 55

42. If a worker tells you they have work-related hand-arm vibration syndrome (HAVS) it should be reported to______.

Question 42 of 55

43. What is the purpose of the health and safety file that is given to a client once a project is completed?

Question 43 of 55

44. What item should be regarded as a last resort for a worker’s safety if he/she is working at height?

Question 44 of 55

45. According to the Construction (Design and Management) Regulations 2015, Which of the following MUST be in place before demolition work can begin?

Question 45 of 55

46. When MUST the Health and Safety Executive (HSE) be informed of fatal accidents or dangerous occurrences on-site?

Question 46 of 55

47. What danger is created when too much oxygen is in a confined space?

Question 47 of 55

48. According to the Construction (Design and Management) Regulations 2015, how long MUST you keep inspection records?

Question 48 of 55

49. If a prohibition notice is issued by a Health and Safety Executive (HSE) inspector it means that______.

Question 49 of 55

50. How should cylinders that contain liquefied petroleum gas (LPG) be stored?

Question 50 of 55

51. Where should cylinders that contain liquefied petroleum gas (LPG) be stored when they are supplying appliances in a site cabin?

Question 51 of 55

52. What should be used to protect people passing by from arc eye if electric welding is about to begin?

Question 52 of 55

53. According to the Construction (Design and Management) Regulations 2015, Which of these MUST be in place before construction work can begin?

Question 53 of 55

54. What is the first thing you should consider when putting people to work above public areas?

Question 54 of 55

55. Where can you obtain details regarding the welfare facilities that must be present on a construction site?

Question 55 of 55


 